Some of the work done at Leeds in recent years.
Major Sports Capital Grants
2022–2024: Sand-based pitch development
2024–2025: New grounds perimeter fencing
2025 - Spectator Fencing
2025: Installation of new ladies’ toilets
2026: Cutting deck for existing mower
2026: New gas boiler for the clubhouse
Coming in 2026:
New equipment and pitch dugouts
Cork City Sports Grants
2019: CCTV cameras installed
2021: Ride-on mower purchased
2022: Security doors installed in the clubhouse
2022: Lighting installed for the sand-based area
2023: New fire system installed in the clubhouse
2024–2025: Extension of Pitch 2
2025: Verti-drainage of pitches
FAI Funding
2017: Redevelopment of the all-weather pitch and installation of lighting
Other Club Improvements
2020: Installation of a new kitchen
2022: Goal cage storage area developed
2023: New clubhouse windows installed
2023: Warm-up area developed behind the all-weather pitch
2023 - Purchased own Vertidrainage machine
2024: Storage areas built in dressing rooms
Major Sports Capital Grants
2022–2024: Sand-based pitch development
2024–2025: New grounds perimeter fencing
2025 - Spectator Fencing
2025: Installation of new ladies’ toilets
2026: Cutting deck for existing mower
2026: New gas boiler for the clubhouse
Coming in 2026:
New equipment and pitch dugouts
Cork City Sports Grants
2019: CCTV cameras installed
2021: Ride-on mower purchased
2022: Security doors installed in the clubhouse
2022: Lighting installed for the sand-based area
2023: New fire system installed in the clubhouse
2024–2025: Extension of Pitch 2
2025: Verti-drainage of pitches
FAI Funding
2017: Redevelopment of the all-weather pitch and installation of lighting
Other Club Improvements
2020: Installation of a new kitchen
2022: Goal cage storage area developed
2023: New clubhouse windows installed
2023: Warm-up area developed behind the all-weather pitch
2023 - Purchased own Vertidrainage machine
2024: Storage areas built in dressing rooms